Case study of geotechnical engineering investigation under complex geological conditions

Advance in Civil Engineering / 2020,2(1): 26-31 / 2020-04-21 look2485 look4117
  • Authors: 尹小雷     
  • Information:
    河北建筑工程学院,张家口
  • Keywords: Nuclear power plant; Geotechnical engineering; Survey 核电厂;设计阶段;岩土工程;勘察
  • Abstract: With the rapid development of China's economy in recent years, industrial and domestic electricity consumption reached unprecedented levels,the nuclear power plant construction has become increasingly important,geotechnical engineering investigation is important to the entire nuclear power plant project. In this paper,combing existing nuclear power plant technical specifications,aiming at the problems found in preliminary design stage,measures to solve geotechnical engineering problems under complex geological conditions are discussed. 随着近年来我国经济的飞速发展,工业及生活用电量达到了前所未有 的水平,核电厂的建设也显得越来越重要,岩土工程勘察对整个核电厂工程具 有重要意义。文章结合我国现有核电厂勘察技术规范,针对核电厂初步设计阶 段岩土工程勘察中发现的问题,就解决复杂地质条件下岩土工程勘察问题进行 了初步探讨。